I stopped into my local driver’s license center to see if they had the new road maps. Sure enough, they did not disappoint and in fact did have copies of the 2013 official road map. No idea why they decided to print another in succession, even so, here are the changes since last year.
Bucks County/Montgomery County US 202 parkway completed from PA 463 to PA 611
Fayette County/Washington County PA Turnpike 43 completed from Exit 22 to Exit 30
The E-ZPass-only slip ramps on the Pennsylvania Turnpike are now white-on-purple circles. Previous editions up to this point used the standard white-on-red circles. Those are the same that denote interchanges on the Turnpike System. Purple is the color in the federal Manual of Uniform Traffic Control Devices now used to denote electronic toll facilities. These interchanges are strictly all-electronic. In other words, they do not have staffed toll booths like the other ones on the original Turnpike.
Those are all the changes to the 2013 official road map. It has the same dimensions as the previous year’s. However, this year’s cover features a picture of the Gettysburg Battlefield.
Today, I stopped by my local DMV to get my driver’s license renewed. It was an uneventful process. That probably had to do with the fact that there had been an icing event that morning and no one was out traveling as they were usually after Christmas. As I waited for the new one to finish laminating, I happen to notice down at the other end of the counter, stacks of state maps. So, I picked up a copy of the 2012 official road map. I guess better late than never that I was able to secure a copy right under the wire. No idea why the Department of Transportation and VisitPA decided to print another in succession, since there is only one change.
Montgomery County US 202 Parkway shown as completed from US 202 to PA 463
The parkway is a “consolation prize” for the lack of a full expressway. Planning for, which took place in the 1960s and 1970s as the Piedmont Expressway. Rather than build an expressway, the new roadway is and will be an at-grade facility with separated trails for biking and walking along the route. This was the more favorable plan for the communities along the new US 202 alignment.
That is the only change to the 2012 official road map. It has the same dimensions as the previous year’s map. However, this year’s cover features a picture of a man kayaking on the north branch of the Susquehanna Water Trail.
Today I received an order from PennDOT which included a copy of the 2011 official road map. It is not surprising PennDOT went to the trouble of printing one, since we elected a new Governor last year and therefore have a new Secretary of Transportation. These are the changes since the 2010 edition:
Fayette County PA Turnpike 43 completed from West Virginia to Exit 2 and the US 119/PA 51 interchange to Exit 15
Indiana County US 22 is now a four-lane, divided highway from just east of Blairsville to Armagh
Lycoming County US 15 upgraded to an expressway from north of PA 14 to PA 184
Philadelphia Inset Street Road E-ZPass-only slip ramp completed
Those are all the changes to the 2011 official road map. For most of the URLs on the map, there is a likewise corresponding Microsoft Tag to scan with a smartphone. However, the link for VisitPA uses a regular QR Code.
No longer appearing on the map is the yellow shading of “Selected Built Up Areas.” Meanwhile, the dark, shaded areas of urban concentrations remain. State Game Lands have changed from a peach coloring to a tan one. The State Park textured color used to indicate the extent of said park has been removed, but it remains in the city insets.
Above all, the US 22/US 322 shield error on the 2010 map on the Penn-Lincoln Parkway at PA 60 is now the correct US 22/US 30 shield. There is now an inset for the Elk Scenic Drive in the upper left corner over Lake Erie. A yellow highlight instead of an orange one indicates its path on the main map.
It has the same dimensions as the previous year’s map. However, this year’s cover features a picture of Independence Hall.
The brisk morning of December 13 marked the beginning of the end for the long-awaited Uniontown-to-Brownsville section of the long-awaited Mon-Fayette Expressway. It was then that the flyover interchange opens between PA Turnpike 43, US 119, and PA 51/Pittsburgh Street in Uniontown.
With the SWPA XMAS Meet a week away, I decided to make a trip to scout locations for the tour. Unfortunately, I didn’t get there until dusk, so none of the pictures came out clearly enough to post. The few that I did take, I was able to update the US 119 and PA Turnpike 43 Exit Guides. The interchange itself is quite an impressive Semi-Directional “T,” with the diamond interchange with PA 51 underneath. What is strange is that the ramp from US 119 northbound is only one lane. It should be two since it is carrying the PA Turnpike 43 designation.
While both directions of US 119 have a diagrammatical sign for this complex junction, the guide sign for Turnpike 43 heading southbound on US 119 has the control cities of Brownsville and Pittsburgh, while northbound it is just Pittsburgh.
As of now, there are no exit numbers for any of the interchanges between the Chadville Demonstration Project in South Uniontown and the new interchange at Pittsburgh Street. Not surprising considering that there is only one PA Turnpike 43 marker on US 40 westbound/US 119 northbound. It is located just before the Main Street interchange. While the US 40 and US 119 markers are posted together, the poor PA Turnpike 43 is by itself about 30 feet before the other two. Poor PA Turnpike 43, ostracized by the black and white markers! Heading southbound, there is only one mention of PA Turnpike 43 on a pull-through sign at the Main Street interchange. Then there is nothing until the 40/119 split. Only then is it denoted as PA 43 which it has since that section was completed almost two decades ago.
While the flyover interchange opens, the segment from it to Exit 15 at Northgate Highway also opened to traffic Monday. Northbound traffic exiting and southbound traffic entering at that interchange will have to pay a toll.
Today, I stopped at the welcome center on Interstate 70 at the Maryland state line in Warfordsburg and picked up a copy of the 2010 official road map. I am surprised PennDOT even bothered to print one this late in the year that isn’t a “B” version, especially since there will be a new governor come Tuesday. These are the changes since the 2009 edition, all of which involve the extension of Interstate 376:
Allegheny County/Pittsburgh Inset Interstate 376 extended west beyond I-279 to multiplex with US 22/US 30 and replace PA 60 Interstate Business Loop 376 replaced Business PA 60
Beaver County/Lawrence County/New Castle Inset Interstate 376 replaced PA 60 and PA Turnpike 60
Mercer County Interstate 376 replaced PA 60 PA 760 replaced PA 60 from I-80 to Sharon
Those are all the changes to the 2010 official road map. In addition, there are two mentions of the new 511 system: one on the back cover under the list of welcome centers and another at the top next to the legend.
Rarely do I find an error on the official maps, but this year there is a blatant one near the junction of the Penn-Lincoln Parkway and PA 60 west of Pittsburgh. A US 22/US 322 shield is located where there should be, and last year was, a US 22/US 30 shield.
It has the same dimensions as the previous year’s. However, this year’s cover features a view of Johnstown from the Inclined Plane station above the city in Westmont.
After a six-year hiatus, the second SEPA Road Enthusiast Meet was held today. I’d like to thank all who attended and for making the trip for the 2010 SEPA Meet, which took the record for attendance at a Pennsylvania meet from the 2003 SWPA Meet.
The 2010 SEPA Meet began as usual at 12 PM at the Sly Fox Brewhouse & Eatery, home of the Route 113 Indian Pale Ale, on what else, PA 113 in Phoenixville. Some of the attendees did partake of the Route 113 IPA, or as PennDOT would call it, the SR 0113 Indian Pale Ale. It just might end up being the official beverage for road enthusiasts over the age of 21. The food was good as well as the conversations.
Many of the attendees brought road-related materials to peruse as well as to keep: Adam Froehlig – various state official maps from Virginia, West Virginia, and Pennsylvania; Doug Kerr – I-87 Northway maps; and H. B. Elkins – goodie bags full of Kentucky maps and other Kentucky Transportation Cabinet paraphernalia. I brought a planning map for the Keystone State’s Interstate System from the early 1960s for guests to view. In 2006, I had acquired that from eBay.
After lunch, we hopped in our cars and followed PA 23 to the first stop, which was at the Philadelphia Traffic Management Center in the PennDOT District 6-0 headquarters in King of Prussia. Thanks go to Len Pundt, who worked for PennDOT and who helped arrange the tour. The TMC, which was called the Traffic Control Center when I toured it in 2004, has been upgraded since then. Two video walls show feeds from traffic cameras around Philadelphia, as well as content from the Internet and TV. There was a bit of excitement as we were witness to an accident on the Platt Bridge, tying up traffic. Accidents seems to have become a constant with Pennsylvania meets involving a traffic management center tour.
Continuing east on PA 23, we stopped at the Schuylkill Parkway overpass just north of Bridgeport. Len described what was to have happened with that project. It would have been the eastern end of the “Goat Path” Expressway, which was to begin in Lancaster. Len provided some background on this abandoned project. One of its current uses is as a driver training course for the State Police. He explained PennDOT’s funding issues, which led to it cancelling this and numerous other expressway projects in the 1970s. One of the points he made was that cancelling these projects did initially save money. However, there is no way to build these to solve the traffic issues of the 21st Century. Right-of-way acquisition alone would be astronomically high to carve these highways through dense urbanized areas.
We bid Len adieu and took I-276/PA Turnpike eastbound to PA 309 northbound to observe some of the rehabilitation project. Work has been taking place since 2003 along the Fort Washington Expressway. As soon as joining the expressway, we experienced a vastly improved roadway from the one that had been serving commuters since it was built as a new alignment for US 309. We encountered the last remaining section to be undergoing rehabilitation heading north and exited in the construction zone at Norristown Road to go west to Bethlehem Pike. That roadway was the pre-expressway route of US 309. Traveling north to Cedar Hill Road allowed us to view the progress on the northernmost segment from an overpass.
After stopping at the overpass to see the work, we continued northeast to PA 63 then turned northwest to go to the intersection with US 202 to see the progress on the US 202 Parkway project. A new alignment is underway at PA 63 and work is taking place south along the current alignment.
We passed some of the work along US 202 as we headed back to the Sly Fox Brewhouse & Eatery to conclude the 2010 SEPA Meet. Back at the restaurant, we said our farewells and headed to our respective destinations.
The Federal Highway Administration vetoed the Commonwealth’s plan to put tolls on Interstate 80 to help fill the potholes in PennDOT’s budget. Since then, ideas on how to accomplish that feat in a different manner have been flying fast and furious. Any plan will mean drivers will pay more. The task of finding $472 million was taken up by three state representatives: Bill Kortz of Allegheny County, Michael O’Brien of Philadelphia, and Scott Conklin of Centre County. Their idea? Tolls! What a welcome to Pennsylvania for drivers.
Their idea is officially called Special Session House Bill 2 or “Gateway Tolling for Transportation Independence Today.” It would have toll plazas constructed at the state lines on Interstates 78, 79, 80, 81, 84, 90, and 95. Traffic entering and exiting would be charged anywhere between $1 for passenger vehicles to $5 for trucks. Residents near the borders could buy a book of tickets at a reduced price to give them a cheaper toll. However, trucking companies based within Pennsylvania would be entirely exempt from paying. The toll booths would be manned by PennDOT, not PTC, employees. They would offer coin-drop baskets as well as E-ZPass gantries equipped with video cameras to capture violator’s license plates who would receive a bill in the mail.
These tolls would basically be a “user fee” paid by those who drive said Interstates, for maintenance of said Interstate. Tolling currently free Interstates whose construction was funded 90% by the federal government is allowed to provide for maintenance, and only maintenance. The plan to toll Interstate 80 would have siphoned money off for other transportation-related projects, which is not allowed. Representative Coklin estimates that between $235 million and $300 million a year could be raised for the Department of Transportation.
The proposal faces two roadblocks: passage by the special session of the Legislature and a stamp of approval from the Federal Highway Administration. Since the proposal would need their approval, the process for implementation could take several years. Therefore, the idea might not provide immediate results.
Interstate 80 turns the big 4-0 this year! For most of those 40 years, politicians have been trying to undo what was done. President Dwight D. Eisenhower signed the Federal Highway Act of 1956. It kicked off the building of the Interstates as a system of free, limited-access highways crisscrossing the United States. This happened at a time when building toll roads were all the rage. Pennsylvania was the first to build a long-distance toll road and other states followed our lead.
Once the mainline Turnpike was finished and the Northeast Extension nearing completion, the Turnpike Commission looked to building other extensions. However, Ike stole the PTC’s thunder by putting pen to paper. All of those proposed extensions became the blueprint for the Department of Highways to lay out the Commonwealth’s Interstate System. Without Eisenhower witnessing the German Autobahns first-hand as Supreme Commander of the Allied Forces in World War II, what we now now know as Interstate 80 would have been constructed as the Turnpike Commission’s “Keystone Shortway.” So the idea of a toll road slicing right through the middle of Penn’s Woods is not a new idea. It’s just made to seem that way.
The exact day of Interstate 80’s completion is marked as September 21, 1970. Once completed, it was obvious that the road offered a shorter route between New York City and Chicago versus going north via the New York State Thruway or south via the Turnpike. Of course it wouldn’t be fair for Pennsylvanians to pay the entire cost of maintenance on the Interstate when most of the users were from out of state and just passing through. The first idea to change the Keystone Shortway into the “Keystone Tollway” came during the Milton Shapp administration in the early 1970s. Nothing happened.
The plan was resurrected in the 1980s when the Turnpike Expansion bill known as Act 61 was signed. Again nothing happened. In the late 1990s, Representative Bud Shuster (yes, Mr. Interstate 99) resurrected the idea because he felt road repairs were due. The proposal was originally rejected by Governor Tom Ridge but in April 1999 he went back; however, again nothing happened as Ridge was tapped to be the first Secretary of Homeland Security.
The idea resurfaced in 2004. Department of Transportation Secretary Allen Biehler told the state House Appropriations Committee then that a series of toll plazas could be built approximately every 30 miles across the state. He added that the feasibility study had been going on for several months and would take another two to complete. PennDOT would just need permission from the Federal Highway Administration to charge tolls. The reason is because federal money was used to build the Interstate.
There is also the question of whether the PTC or PennDOT would be in charge of operations and maintenance. Tolls are one option for raising needed funds to pay for maintenance and possibly widening it to six lanes in sections. One section in particular is from Interstate 81 to the Delaware River. A year later on March 8, 2005, Secretary Biehler told the Senate Appropriations Committee that costs of building toll booths, maintenance facilities, and police stations would exceed $650 million and take years to complete.
A PennDOT study stated it would be feasible to charge tolls over the long run. However, it would take decades to break even and pay off the debt. Biehler said that “it wasn’t a wise move to institute tolls at this time.” State Senator J. Barry Stout of Washington County said he was “a little shocked to see the final conclusion.” As the minority chairman of the Senate Transportation Committee, he endorsed the idea of putting ten toll booths, with a $2.50 fare at each, on the Interstate from Ohio to New Jersey. Again, nothing would happen.
The idea seemed to really start gaining traction in 2007 when Act 44 was passed. Under the terms, the Pennsylvania Turnpike Commission would take over operation of the road and construct ten toll plazas at 30 mile intervals from Ohio to New Jersey. The estimated $946 million/year collected from them, as well as increased fare rates on the mainline Turnpike, would go to fund highway and bridge repairs across the state. Officials continued to push ahead by announcing that the PTC would spend more than $1 billion on improvements to the Interstate over the next few years. They would include repairing bridges, adding truck climbing lanes, upgrading pavement, and extending on-ramps.
On October 16, 2007, the Department of Transportation and Turnpike Commission entered into a 50-year lease agreement for Interstate 80. As part of Act 44, the two agencies filed a formal application with the Federal Highway Administration on October 13 seeking approval to implement tolls.
However, in a letter dated October 17 to Transportation Secretary Allen Biehler and PTC CEO Joseph Brimmeier, chief counsel and acting deputy administrator of the Federal Highway Administration, James D. Ray stated,
As should be clear, FHWA has not granted Pennsylvania the authority to toll I-80. In fact, now that we have received a formal application, we will conduct a thorough analysis of the application’s merits based on the statutory criteria and determine if the selection of Interstate 80 in Pennsylvania for one of three nationwide tolling pilot authorities is appropriate. The approval of any application under this program is a discretionary decision. We will take into account a variety of factors, including, but not limited to, actual or expected competition from other interstate facilities.
On the night of Thursday, November 9, Congress eliminated the amendment to a transportation appropriations bill that would have forbidden putting tolls on free Interstates. That was done at the request of Governor Rendell, Democrats, and Senator Arlen Specter. The two Representatives from along the corridor who added the rider cried foul.
On July 14, 2008, the Turnpike Commission announced its planned $2.5 billion upgrades to the Interstate in the first decade of ownership. The upgrades include building two new interchanges to connect the Interstate with Interstate 99, replacing or resurfacing about 80 percent of the 311 miles, and replacing 60 original bridges.
On August 6, the PTC announced their toll collecting would be much different than that on their other expressways. Instead of traditional toll plazas, Interstate 80 would be the first all electronic toll road in Pennsylvania. It would have E-ZPass readers at nine gantries across the state each costing $60 million to build. Those without a transponder would be sent a picture of their license plate and a bill for their toll plus a $1 processing fee. In both cases much like the 407 ETR outside of Toronto, Ontario.
Those with transponders would also get a free pass at the first gantry, roughly equating to a 60-mile free ride on the road. After that, they would be charged $2.70 at the second and each gantry after wards. This offer would not be extended to most commercial vehicles, including 18-wheelers that account for up to 30% of traffic. However, regular users would be eligible for volume discounts.
Feeling confident and having all their cars in a row, the state resubmitted the plan on July 22, 2008. They expected the decision would take two or three months to decided on phase one approval for tolling Interstate 80. Two months later, the decision handed down was against tolling 80, so yet again nothing would happen.
The story might have ended there. It didn’t as the Commonwealth submitted the exact plan a second time in late October 2009. It came as no surprise to this blogger that on April 6, 2010, yet again the application was rejected. However, this time it seems the Federal Highway Administration finally drove a stake through the plan’s heart. Governor Rendell announced that day that it will not be resubmitted. Therefore, it can finally be said that after 40 years, nothing will happen.
It is that time of the year, commonly referred to as the holiday let down. That period in the calendar when we go from ushering in a new year to hiding eggs. People start looking forward to the Summer and vacation time it will bring. It is also that time of the year when the trucking industry magazine, Overdrive, releases the results of their latest “Worst Roads” survey. Sadly to say, we’re number one again.
For most of the 1990s, Pennsylvania held the dubious distinction of “Worst Roads” in the United States. The state’s fortunes began to change in the late 1990s, when Pennsylvania slid down to second place.
For the past decade, the number one slot has bounced between newcomers such as Arkansas and Louisiana. Pennsylvania has taken top, or bottom, billing 13 out of 19 years Overdrive has been conducting the survey. It takes the title back in 2009. I find this distinction particularly amusing this year. The reason being the replacement or rehabilitation of all the structurally deficient bridges thanks to the American Recovery and Reinvestment Act. In fact, a Congressional committee named Pennsylvania as the top-ranked large state, third overall, for starting and completing projects funded by the ARRA.
States are not just judged by the conditions of their highway systems, but other things related to trucking. Interstate 80 still retains the title of “Most Improved Road” from last year. However, in 2008 it was second under “Best Highway Segment” and forth under “Worst Highway Segment.”
Interstate 80 through Stroudsburg
Pennsylvania still retains third place for “Toughest on Truck Inspections and Law Enforcement.” A distinction it shares with Maryland this year. The strangest change is our truck stops. They went from third best to a tie with California and New York for third worst. Now that’s some swing!
You’re probably wondering how something like that, or the aforementioned Interstate 80 ranking, can happen. I learned from an editor with Overdrive the process of tallying the votes. Instead of averaging the good and bad scores, the good and bad are separated, then averaged. That explains how Pennsylvania was second under “Worst Roads” and five under “Best Roads” one year.
Unfortunately, no shout out this year for me or the website. It is just as well since Pennsylvania highways (the ones made of concrete and asphalt) are back on top, or bottom.
This past weekend, I stopped at the welcome center on Interstate 70 at the Maryland state line in Warfordsburg. In doing so, I picked up a copy of the 2009 official road map. Here are the changes since the 2007 editions:
Berks County/Chester County PA 82 removed between Elverson and Birdsboro
Blair County/Centre County/State College Inset Interstate 99 completed from Bald Eagle to State College in addition to being signed from there to Interstate 80
Fayette County PA Turnpike 43 completed between Exit 15 and Exit 22 and shown under construction between Exit 22 and PA 88
Lehigh County/Allentown-Bethlehem-Easton Inset US 222/Trexlertown Bypass completed from PA 100 to Interstate 78
Tioga County US 15 finished from PA 287 to New York and PA 287 extended further along old US 15 to Lawrenceville
New Castle Inset US 224 extended further than US 422/PA 60 eastward on State Street and Falls Street
In conclusion, those are all the changes to the 2009 official road map. It has the same dimensions as the previous year’s; however, this year’s cover is of an Amish buggy driving on one of the newly designated Civil War Trails. You can view the map at PennDOT’s GIS page.
If the Departments of Transportation and Tourism would have waited, they could have given a shout-out to our three professional sports teams that won championships in the past year. The North Carolina Department of Transportation did that for the Carolina Hurricanes on the cover of their 2007 map.